Mar 27, 2017 @ 10:24
The Ministry of Transportation wishes to advise that motorists can expect short-term traffic delays due to ongoing construction at the Nipigon River Bridge on Highway 11/17 on Monday, March 27 and Tuesday, March 28 between 9 am and 8 pm.
We apologize for the inconvenience and urge motorists to schedule their travel to minimize any delays. Motorists are reminded to obey and follow all traffic signage for the safety of both workers and drivers.
For the latest information on highway closures and construction, the public can call 511, MTO’s Road Information Line or check www.ontario.ca/511.
Latest posts by Brenda Stockton (see all)
- Traffic Delays on Montreal River Hill - December 22, 2024
- Hwy 17 (White River to Marathon) Open - December 22, 2024
- Saturday Morning News – December 21st - December 21, 2024