Tag Archives: Nipigon River Bridge Failure

Professional Engineers Ontario Launches Investigations into Engineering Work Related to Nipigon River Bridge Failure

Oct 21, 2016 @ 11:11 On October 14, Professional Engineers Ontario (PEO), the licensing and regulating body for professional engineers and professional engineering in the province, initiated investigations related to the January 10, 2016 failure of the Nipigon River Bridge. “As a regulator, it’s our responsibility to investigate any possible engineering practice deficiencies related to the failure and determine if ...

Read More »

Nipigon River Bridge – Temporary Repairs Installed, But Why Did Bridge Fail?

Early Saturday morning the work was completed. The primary temporary repairs have been installed and tested. The MTO anticipates that additional short-term closures of 15 minutes or less may still occur throughout the weekend while necessary bridge repairs are undertaken in order to open the bridge to two lanes of traffic by the end of the month. It has taken ...

Read More »

The Nipigon River Bridge ‘an architectural masterpiece & engineering nightmare’

Was the building of the Nipigon River Bridge a waste of taxpayer monies in creating a “jewel of the north’. More show than form? Wawa-news has received information from a Professional Engineer who is very familiar with this type of structure, and in fact was the Structural Designer of world’s first Cable Stayed Post-Tensioned Steel Structure – Baxter Labs headquarters in ...

Read More »

Hughes – Failing infrastructure severs vital transportation link

By now we have grown accustomed to the compelling arguments in favour of re-investing in Canada’s crumbling infrastructure, but what are we to make of the damage to the bridge over the Nipigon River which is new and not even fully constructed? In case you missed the story, the bridge failed recently when bolts holding the structure to the western ...

Read More »

Nipigon OPP – Nipigon River Bridge CLOSED

On January 10, 2016 at approximately 3:15 PM police received a report that the Nipigon River Bridge on Highway 11-17 had lifted, blocking traffic. Police arrived on scene and noted the west side of the bridge had lifted approximately 60 centimetres.  No injuries or vehicle damage occurred as a result of this incident. The bridge is currently closed to vehicle ...

Read More »

Bridge Failure will cause Major Transportation Issues in Northern Ontario

  The first half of the new Nipigon River Bridge, Ontario’s first cable-stayed bridge was opened on November 29th, 2015 after 3 years of construction. The completed bridge will feature three towers with cables supporting the bridge deck and a separate sidewalk for pedestrians.   MMM Group Limited designed a four-lane, two-span, composite-cable-stayed bridge for the Highway 11/17 Nipigon River bridge on ...

Read More »