The deconstruction of Mission Road (Chris Simon Drive) and Main Street (Gladstone) has begun. The first dump truck of pavement was loaded and removed Tuesday morning.
This rejuvenation of Mission Road will change from 4 lanes to two opposing lanes with a turning lane separating them. The two outside lanes will become bike lanes. Construction is expected to be completed before November 30, 2020; but as is in all construction projects – weather dependant.
Latest posts by Brenda (see all)
- Hwy 17 (Between Marathon & Terrace) One Lane OPEN - July 15, 2026
- No Power in Upsala - July 15, 2026
- Celebration of Life – Doreen Cachagee - July 15, 2026
Wawa-news.com Local and Regional News